Kapooka Redevelopment Project - Blamey Barracks

Overview

The 2024 National Defence Strategy provides a renewed focus on workforce. Investment in modern, contemporary, and fit-for-purpose facilities in which to live, train and work, is critical to achieving this Strategy.

Defence is proposing to undertake redevelopment works at Blamey Barracks, Kapooka, located approximately 9.5 km west of Wagga Wagga NSW.

In 2023, the project was referred to the Department of Climate Change, Energy, the Environment and Water (DCCEEW) under the Environment Protection and Biodiversity Conservation Act, 1999 (EPBC Act). In 2024, DCCEEW determined that the project (the proposed action) constitutes a ‘Controlled Action’ under the EPBC Act.

Defence has prepared Preliminary Documentation which consolidates all the information DCCEEW needs to make its assessment and reach its approval decision. This includes information on how the design of the project has minimised impacts to the environment, considered existing contamination and carefully considered the heritage values of Kapooka in the redevelopment.

Project details

The project is proposing to deliver the following works:

  • a new Headquarters Building
  • new Living-in Accommodation, with training, wellbeing, and support facilities
  • A Recruit Welfare Facility (including a multi-function centre and retail services)
  • new or upgraded engineering services and supporting infrastructure, including a ring road, car parking and pedestrian footpaths
  • a new Kapooka Heritage Trail
  • expanded Chaplaincy and recruit Wellbeing Facilities
  • Contractor’s Precinct with dedicated Land Management Compound
  • Clothing and Q-Store
  • Explosive Ordnance Storage and Distribution Facilities
  • an expanded Weapons Range.

Consultation

The project was made available for public comment on the DCCEEW EPBC Act Public Portal website, when it was first referred to DCCEEW.

Public consultation periods:

  • The first 10 business day period was 24 November 2023 to 12 December 2023.
  • The second 10 business day period was 28 August to 10 September 2024.

Preliminary Documentation

The draft Preliminary Documentation was placed on public exhibition for 10 business days from 28 August 2024 to 10 September 2024. No public submissions were received during this period, and the period for public comment is now closed.

In accordance with Section 95B(4) of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act), the final Preliminary Documentation is on display for 10 business days from 18 September 2024 to 1 October 2024.

Blamey Barracks Kapooka Redevelopment Project (EPBC 2023/09649) (PDF, 20.28 MB)

Hard copies of the final Preliminary Documentation are available at the following locations:

  • State Library of NSW
    1 Shakespeare Place, Sydney NSW 2000
  • Wagga Wagga City Library
    243 Baylis Street, Wagga Wagga NSW 2650

For assistance in accessing the Preliminary Documentation, such as for those for whom English is a second language or who have a vision impairment, can contact 1800 290 601.