skip to navigation skip to content skip to footer

Defence Estate Quality Management System (DEQMS) BSI Certification

Engineering & Maintenance Compliance ElementEngineering & Maintenance

Electrical Engineering - High Voltage Documents

(If there is more then one document we have linked a zip file)

Base Reports Master Plans Project Development Plans Protection Reports Management Plans
Anglesea Barracks June 21
Army Aviation Centre Oakey June 09 June 08
Army Enoggera February 2020
Army Lavarack December 2020 June 09
Bandiana Army Barracks March 09
Blamey Army Barracks April 09
Campbell Army Barracks December 08
Defence Establishment Orchard Hills June 2020 June 18
DSTO Fishermans Bend April 08 March 17
Edinburgh January 20

May 2017
Appendix B - Load Profileis 2016-17
Appendic C - Cost Plan Management
Appendix D - HV Requirements
Appendix E - Drawings E001 to E006
Appendix E - Drawings E007
Appendix E - Drawings E008
Appendix E - Drawings E009 to E016

September 07  
Harold E Holt (HEH) May 2021
Henderson - WA June 2021
HMAS Albatross May 09 September 10
HMAS Cairns   July 2020  
HMAS Cerberus May 08 Overhead Power line Clearance Management Plan April 2019
HMAS Coonawarra Feb 09
HMAS Creswell June 08
HMAS Harman   November 2019
HMAS Stirling August 2020
Cost Estimates
June 2022
October 2019
HMAS Watson     April 2020  
Holsworthy

Report for Liverpool MilitaryArea Electrical Reticulation MasterPlan Outline June 06
Report for Holsworthy Army Barracks Master Plan Outline Report September 2011

Jervis Bay Territory September 11
Larrakeyah Barracks July 2019
Murray Bridge Training Area

2012

Please note that there are items identified by the consultant for Defence to consider. These are described in Sections - Future Loads and Other Issues. These need to be considered by the Project Officer and the Region and include: supply continuity and maintenance issues; bush fire hazard and mitigation measures that need to be considered and future undergrounding of the existing overhead cabling should be considered if reasonably practicable. Other mitigation measures should be taken in the mean time as and when appropriate. It is recommended that Defence Project Officer's and the Region Officers seek DEEP advice when considering augmentation of the high voltage system

 
Navy Garden Island Sydney September 2020 September 2011 January 2017
Pearce
Point Wilson   June 2020
Port Wakefield September 11
Puckapunyal Army Base June 09 September 2011 February 08 Overhead Power line Clearance Management Plan April 2019
RAAF Amberley December 2020 November 2016
RAAF Curtin   April 2019
RAAF Darwin

Dec 19
Appendices

Feb 2020
RAAF East Sale April 08 November 2020
RAAF GinGin August 2020
RAAF Learmonth January 09 May 2018
RAAF Pearce August 2020 August 2018 June 2008  
RAAF Richmond Dec 19 March 2021 November 2019
RAAF Scherger September 11
RAAF Tindal August 19 April 2019

January 10

December 2015

 
RAAF Townsville January 20
RAAF Wagga June 09
RAAF Williams (Laverton) May 08
RAAF Williams (PT Cook) May 08 October 2021
RAAF Williamtown May 09 2002 December 2014 May 2019
May 2019
Randwick Army Barracks January 09
Robertson Barracks August 2020 Aug 21
Russell Offices, Canberra     February 2016  
Shoalwater Bay   June 2020  
Simpson Army Barracks May 09 June 2021 Overhead Power line Clearance Management Plan April 2019

Singleton Army Base

June 07
St Kilda (SA)     March 2020
Woomera June 08 September 18
Appendix O - Base Engineering Assessment